Property Description
Extensive preparatory work has already been completed. New utilities, including water and sewer connections, have been installed, with a bank check of $366,000 issued to the city for the work and all supporting documentation available. Power lines have been relocated outside the lot to avoid any interference with construction. Along the perimeter, excavation and the removal of tall trees have already been carried out. To assist in planning, architectural visualizations of the site are also available.
This property is ready to build and offers an exceptional setting for either a refined residence or an investment project in one of Montreal’s most sought-after neighborhoods.
        











